Toilets

Site Access
Filming Logistics
Vehicle planning for production crews at Citadel Studios. The primary entrance archway is a scheduled monument: all access plans must comply with 3.4m height clearance plus gateway width and bridge weight limits to protect the structure from damage.
Critical Access Restriction
Height, width, and bridge load controls apply at the entrance tunnel
Max Height
3.4m
Max Width
TBC
Bridge Weight Limit
TBC
This entrance archway is a scheduled monument. Film crews must plan all vehicle movements around this fixed limit. We cannot tolerate any scraping, impact, or strike damage to protected historic fabric.

Production Amenities
Crew Essentials On Site
Practical infrastructure is ready from day one, so your unit can set up quickly and keep the schedule moving.
Internet
Canteen area
Road access
Water supply
Power supply
On-Site Movement
Site Map
After vehicles pass the entrance point, logistics can be distributed across the site using the full internal road network. This supports operational movement between zones for kit drops, crew transport, and servicing.
Road Network & Parking
Additional reference images showing internal road coverage and circulation routes used for production logistics. Immediately before the bridge approach, a large on-site car park can be used as a practical holding and parking area for crew cars and support vehicles.
Need to Confirm Vehicle Access?
Send your logistics list before arrival
Share vehicle height, width, gross weight, axle details, quantities, and timings to help us coordinate arrival windows and internal routing across the site.